Based on high standards and look at the world
Marine Loading Arm(MLA) is the euipment used to transe fu beween the dock pipine and the tank ship. During the process of fuid transportation,the MLA ill move with the tank ship within the design range to avoid damages to the system. When the tank drit is about to eceed the design range, the position monitoring ystem can riger audio and visual alarm. it can also be equipped with Emergency Release System (ERS), when the tank ship is moving out of the design range, the ERS will work and to protect both MLA and tank ship from damage.When releasing,the valves at both ends of the ERC will lose quickly,to ensure that there is almost zero leakage of the fluid. HydraulicQuick Connect/Disconnect Coupler (QCDC) which enables the MLA to connect or disconnect quickly with the ship manifold fiange can also be added,to reduce the workload of the operator.
AM61M Marine Loading Arm
Manual operation, double counterweights and seli support design, with features of easy opera tion, small dead weight,space occupation and dead weight
Normally testhan 8", applicable for inland river jetty and other small jety
上一篇:没有了
Lianyungang Sugang Petrochemical Equipment Co., Ltd.
0518-85381868
13357863568
lygsuga.jhc@163.com
No. 1, Yingyue Road, Lianyungang Economic and Technological Development Zone